`UNIVERSITY OF TECHNOLOGY SYDNEY
FACULTY OF ENGINEERING
Floodplain Management 49117
Assignment 4B
Assignment covering Evacuation Management
2) Evacuation Time Modelling based on Nevagazunda. Develop an evacuation strategy for the town of Nevagazunda in the event of a 100 year ARI (1% AEP) flood. Based on this strategy develop an evacuation timeline. Use the data availablein the Nevagazunda (Part 1) exercise to develop the time line. Assume that all bridges will have1 lane operational for evacuation during floods and 600 cars can pass per hour per lane. Stateany assumptions that you make.
Make recommendations to increase the evacuation time available.
The entire assignment must be submitted as a single report in Word or PDF format. Please submit in UTSonline dropbox (under assignment folder
This assignment is worth 25% of the total assessment load for this subject.
Figure: Nevagazunda 100 yr stage hydrograph
Marking Criteria
NSW Emergency Planning Framework |
5 |
SES Planning Process with discussion on each step |
10 |
Evacuation Management Planning & Operation including Warning |
10 |
System and Flood intelligence database |
10 |
Role of Community Education |
15 |
Evacuation Time Line modelling Draw Critical time line include time available, mobilisation, traffic breakdown allowance, evacuation confirmation, travel time, time available for Door knocking, delay to vehicles movement, time available for vehicle movement |
25 |
Discussion |
15 |
Recommendation |
10 |